HomeFull Roof Replacement in Dickson, Tennessee
GEJ Roofing LLC

Full Roof Replacement in Dickson, Tennessee

≈30 SQ • FULL REPLACEMENT • COMPLETED IN 1 DAY

GEJ Roofing completed this approximately 30-square residential roof replacement in Dickson, Tennessee in one day. The new roofing system features Timberline HDZ architectural shingles in Charcoal, Cobra Rigid Vent 3, and Seal-A-Ridge Charcoal ridge cap shingles.

GEJ Roofing completing the 30-square roof replacement in Dickson, Tennessee.

Project at a Glance

  • Location: Dickson, Tennessee
  • Project: Full roof replacement
  • Approximate size: 30 squares
  • Roofing: Timberline HDZ architectural shingles
  • Color: Charcoal
  • Decking: Small damaged section replaced as needed
  • Ventilation: Cobra Rigid Vent 3
  • Ridge cap: Seal-A-Ridge Charcoal
  • Completion: One day

What We Found During Tear-Off

Once the existing roofing was removed, GEJ inspected the roof deck before installing the new roofing system. A small section of damaged decking was identified and replaced so the new roof could be installed over a sound surface.

Only the affected section required replacement—the entire roof deck was not replaced.

The Roof Replacement in Dickson – Step by Step

  1. 1

    Homeowner consultation

    GEJ met with the homeowner and helped select the new shingle style and Charcoal color.

  2. 2

    Existing roof tear-off

    The old roofing system was removed so the roof deck and installation areas could be evaluated.

  3. 3

    Deck inspection and repair

    During tear-off, GEJ identified a small section of roof decking that needed replacement. The affected section was replaced before the new roofing system was installed.

  4. 4

    Roof preparation

    The roof deck was prepared for installation of the new roofing components.

  5. 5

    New roofing system

    GEJ installed Timberline HDZ Charcoal architectural shingles, Seal-A-Ridge Charcoal ridge cap shingles, Cobra Rigid Vent 3, drip edge, and applicable pipe flashing.

  6. 6

    Final completion

    Approximately 30 squares of roofing were completed in one day.

Why Deck Inspection Matters

The condition of roof decking cannot always be confirmed until the existing roofing is removed. Inspecting the exposed deck allows damaged areas to be addressed before the new roofing system covers them. In this case, the limited damaged section was replaced while the sound decking remained in place.

Warranty on This Work

This roof was installed with Timberline HDZ shingles, part of the GAF product line GEJ Roofing uses by default when a homeowner does not have a specific brand preference. Like GEJ Roofing’s other installations, this project is backed by a 5-year workmanship warranty under normal conditions (storm or weather damage and manufacturer defects are handled separately). See GEJ Roofing’s full warranty details.

Planning a roof replacement?

Get an accurate on-site estimate.

Roof size, slope, access, ventilation, flashing details, and decking condition can all affect the final scope.

Talk with GEJ Roofing